WA Quick Help
⚡ QUICK WHATSAPP ESTIMATE
Prestige Paint

Painting an Office in Nigeria: Durability Over Decoration

best paint for Nigerian offices

An office wall is a working surface, not a backdrop. Chairs and trolleys hit it, shoulders brush it, hands touch the same square metre a hundred times a week, and cleaners wipe it. A finish chosen for how it looks in a photograph will look tired within a year.

Commercial painting is also a scheduling problem as much as a decorating one. The business has to keep running while it happens, which changes the labour plan and therefore the price.

Choose on durability first

Prestige Satin Finish is the default for office walls. The film is harder than matt, it is washable, and it does not hold the scuffs and hand marks that a flat finish keeps permanently. In a space where the same walls get touched every day, that difference is the whole specification.

Prestige Matt Finish still has a place: ceilings, meeting rooms and low-traffic areas where the softer look matters and nothing rubs against the wall.

Anything handled — doors, frames, skirting, push plates, metal partitions — takes Prestige Premium Plus Gloss. These are the surfaces that fail first and the ones a visitor’s hand finds.

Where offices fail first

Four locations account for most of the visible wear in a Nigerian office:

  • Corridor corners and reveals — trolleys, boxes and shoulders
  • Behind desks and chairs — chair backs against the wall, day after day
  • Door frames and door edges — constant handling, and the first place paint wears through
  • Kitchen and breakout areas — grease, steam and heat, the same problems a domestic kitchen has

Those four areas justify a harder product even where the rest of the floor is done in satin. It costs a little more and saves repainting the same corners every year.

Colour for a working environment

Light neutrals keep a space bright and do not fight the furniture, the branding or the screens. A strong colour works best on one reception wall rather than across an open floor, where it makes the space feel smaller and shows every mark.

Two practical points. Under fluorescent lighting, dark walls read grey and cold, not rich. And in an open-plan office, a colour that looks warm in a sample pot will look cooler across a large area, because there is more of it in view at once.

Phasing the work around a live business

This is where a commercial job differs from a house. The main constraint is not the paint, it is that staff have to keep working. Practical options:

  • Wing by wing or floor by floor — staff move rather than stop. Slowest overall, cheapest in disruption.
  • Out of hours — evenings and weekends. Fastest for the business, most expensive in labour, and the paint has to cure overnight with the building closed.
  • One concentrated block — take the noisiest and dustiest work, the filling and sanding, into a single period, then paint around normal hours.
  • Holiday shutdowns — if the business has a quiet period, use it. A full floor can be done in a fortnight with nobody inconvenienced.

Agree in advance who moves furniture, where it goes while a room is out of use, and what happens to IT equipment and cabling. Painting around a server room is not the same job as painting an open floor.

Preparation

  1. Fill and sand — especially around door frames, behind desks and any wall that has been patched for cabling
  2. Wash high-touch areas before painting; grease and hand oils stop paint bonding
  3. Prime bare patches and repairs
  4. Two coats, with the first allowed to dry fully
  5. Cut in cleanly at ceiling and skirting — in an office this is the line people judge the whole job by

How much paint an office needs

Office areas are usually straightforward rectangles, so the calculation is simple:

  • Take the floor area and multiply by roughly 2.6 to get wall area, then deduct glazing and doors
  • A 200 square metre floor plate with 25 per cent glazing gives about 390 square metres of paintable wall
  • At two coats and around 11 square metres per litre per coat, that is roughly 71 litres
  • Add 10 per cent for waste and patch repairs: about 78 litres

Glass partitions, exposed ceilings and open-plan layouts reduce the paintable area considerably, so measure rather than assume. Confirm the coverage figure for the product you specify.

What a commercial quote should include

  • The product by name and the litres, per floor or per area
  • The number of coats, stated, not implied
  • Preparation described: filling, sanding, washing, priming
  • Labour in days, and how many people
  • Out-of-hours premium, if the work is outside business hours
  • Protection of floors, furniture and equipment
  • What is excluded — usually IT disconnection and moving heavy furniture

Our guide to what painting costs in Nigeria sets out how to compare two quotes on the same basis.

Getting an office quoted

Send the floor area, the number of rooms or floors, and whether the work has to happen out of hours. We will come back with the products, the litres and the labour plan. Call +234 802 562 5333, message WhatsApp, or send your project details.

Leave a Reply

Your email address will not be published. Required fields are marked *