Most bad paint jobs in Nigeria are not caused by bad paint. They are caused by hiring badly: no written scope, no preparation, and payment in full before the work is finished. This guide is the process, start to finish.
First, decide whether you need a contractor at all
Painting one bedroom yourself is realistic. Painting a whole house is not, unless you have the time, the ladders and somewhere to put the furniture. The dividing line is usually preparation: a professional job is mostly preparation, and preparation is the part that is tedious rather than difficult.
The five questions to ask before you discuss money
- What will you do before the paint goes on? A real answer describes washing, filling, sanding and priming. A bad answer is “we will paint it”.
- Which product will you use, and how many litres? If they cannot name the product and the quantity, they are guessing.
- How many coats? One coat over a colour change is a shortcut.
- Who supplies the materials? If they do, you are paying a markup you cannot see. Many homeowners buy the paint themselves and pay labour only.
- Can I see a job you finished in the last six months? Not photographs. An address.
Check the last job, not the pitch
Look at three things on a previous job: the line where the wall meets the ceiling, the edge where a door frame meets the wall, and the wall behind a piece of furniture. A careful painter cuts in cleanly and moves the furniture. A rushed one does neither.
Ask the owner whether the finish still looks the same as when it was done, and whether anything had to be redone.
Write the brief down
Verbal agreements are how disputes start. One page is enough:
- Every room, with approximate dimensions
- Colours, by name and product
- Which surfaces: walls, ceilings, doors, frames, skirting, exterior
- Products and litres, agreed
- Number of coats
- Preparation included: wash, fill, sand, prime
- Who supplies what
- Start date and finish date
- Price, and the payment schedule
- Who cleans up, and who keeps leftover paint
Both of you sign it. It takes fifteen minutes and it prevents most of what goes wrong.
Payment structure
Never pay in full up front. A workable structure is a materials or mobilisation payment at the start, a second payment when preparation is finished and the first coat is on — that is the point where you can see whether the job is being done properly — and the balance on completion and inspection. Hold back a small amount until you have looked at the job in daylight.
Red flags
- A price given before anyone has looked at the walls
- No mention of primer, ever
- Willing to start tomorrow, with no other jobs on
- Cannot name a single product they use
- Wants full payment before starting
- Quotes per room without asking the ceiling height
- Offers to “cover” a damp patch rather than fix it
What to expect on site
Furniture moved to the centre of the room and covered. Floors covered. Filling and sanding before any paint appears — dust everywhere for a day. Then priming, then two coats, then cutting in. A three-bedroom flat takes most of a week with one or two people, most of it preparation.
If paint is on the walls on day one, the preparation was skipped.
Buying the paint yourself
Most of our trade customers buy from the Prestige range direct and pay labour only. It removes the markup and it lets you see exactly which product went on the wall.
Hiring in Lagos specifically
Lagos adds a few things to the general picture, mostly because access, traffic and site conditions make the job harder to supervise than it looks on paper.
Agree access up front: when the team arrives, whether they can work through the weekend, and whether the estate or building has rules about painting hours, lift use or noise. In a Lagos block, a painter who turns up at 8am to find the lift is reserved is a day lost.
Ask what is included in the price. Scaffolding or ladders for high ceilings, moving furniture, floor protection, and any electrical work around fittings are the usual exclusions, and each is a separate conversation later.
Payment should follow progress, not the calendar: a deposit so materials can be bought, a payment when preparation is finished and the first coats are going on, and a final payment when you have walked the job and the snags are closed. Never pay the balance before you have seen the finished walls in daylight.
A written quote should state the products by name, the number of coats, the preparation included, and what happens if a wall turns out to be worse than expected. If it gives a single figure and nothing else, you are not comparing quotes, you are comparing guesses.
Finally, check a recent local job. Not the photographs on the painter’s phone, which may be years old or someone else’s work, but a property you can visit or a landlord you can speak to. In a city this size, one phone call to a previous client tells you more than any portfolio.
If you supply the materials, you control the quality and you can see exactly what went into the job. Tell us the rooms and the wall area, and we will work out the litres and recommend the product for each surface. Call +234 802 562 5333, message WhatsApp, or send your project details.
Paint for this job
For this work we recommend Prestige Facelift Premium. Ask your stockist for the coverage and tin sizes before you buy, and tell them the room sizes.
